Barrick Mining (B) Q3 FY25 earnings call: guidance and Q&A

Earnings call· Sep 2025 (Q3 FY25)· Materials· Nov 10, 2025

Source: earnings call transcript

Executive summary

Barrick Mining Q3 FY25 — Record cash flow and cash returns overshadowed by three fatalities and a CEO transition

A record cash-generation quarter was overshadowed by three fatalities, pushing safety and a bottom-up operational review to the top of the interim CEO's agenda — the goal being predictable, quarter-on-quarter delivery. Capital and exploration are tilting toward Nevada, where management frames Fourmile as the next major growth engine, while non-core asset sales fund a stepped-up capital-return program.

Highlights

5
  • Gold production rose 4% QoQ and attributable gold EBITDA increased 25% QoQ on just a 5% higher gold price, demonstrating strong operating leverage; gold cost metrics per ounce fell across the board

  • Free cash flow jumped 274% QoQ with company records for operating cash flow, free cash flow, adjusted net earnings and adjusted EPS; ended the quarter in a net cash position

  • Base quarterly dividend raised 25% to $0.125/share and $598M of stock repurchased — a record quarterly cash return to shareholders

  • Share repurchase program expanded to $1.5B via a $500M authorization increase, supported by non-core asset sales (Hemlo, Tongon)

  • Fourmile updated PEA confirms a rare grade/scale combination; 16 drill rigs on site and on track to double the existing resource in 2025

Concerns

4
  • Three fatalities in the quarter — at Goldrush, Bulyanhulu and Kibali (the Kibali death from a Q2 incident) — making safety management's stated #1 priority

  • Pueblo Viejo gold recovery running ~5-6% below the recovery level guided earlier in the year despite record throughput

  • Carlin roaster hit by unplanned downtime from excessive scaling in the Gold Quarry roaster; Lumwana September shutdown left copper production slightly down QoQ

  • Full-year gold production tracking only the bottom half of the guidance range; higher gold prices are pressuring cash costs via royalties

Guidance & targets

CategoryTargetConfidence
Full-year 2025 gold production
Tracking in the bottom half of the guidance range (includes Tongon and Hemlo)
high materiality
High
Full-year 2025 copper production
Tracking to the midpoint of the guidance range
medium materiality
High
Q4 2025 gold production
Continued quarterly growth in line with the 2025 plan for a steady production increase through the year
high materiality
High
Q4 2025 copper production
Similar to Q2 2025
medium materiality
Medium
Full-year 2025 total cash cost
Tracking within guidance after adjusting for the year-to-date higher gold price
medium materiality
Medium
Full-year 2025 AISC
Tracking within guidance after adjusting for the year-to-date higher gold price
medium materiality
Medium
Fourmile resource conversion
On track to double the existing resource in 2025
high materiality
High
Fourmile drilling program
20 drill rigs on the project in 2026
medium materiality
Medium
Fourmile Bullion Hill decline development start
Commence development towards the end of 2026
medium materiality
Medium
Reko Diq project financing signing
Expect to sign the financing by the end of the year (2025)
high materiality
Medium
Net debt policy
Target zero to modest net debt
medium materiality
High
Q4 2025 cash returns to shareholders
Expect Q4 will be even better than the record Q3
medium materiality
Medium
NGM 2026 production profile
Relatively flat versus 2025 (full guidance with Q4 results)
medium materiality
Low

Segment performance

SegmentRevenueYoYQoQMargin
North America (incl. Nevada Gold Mines)
Barrick's value foundation; NGM on track to achieve full-year production guidance and central to shareholder value.
Cortez leach-pad production: significant increase in line with mine planTurquoise Ridge: higher Sage autoclave throughputCarlin: unplanned Gold Quarry roaster downtime (excessive scaling)NGM share of attributable production: more than halfUnit cost per ounce: lower at all NGM sites
——Gold production +4% QoQAttributable EBITDA +19% QoQ
Latin America & Asia Pacific
All assets in the region on track to meet full-year guidance, including PV; Veladero's seasonal decline offset PV's record throughput.
Pueblo Viejo processing throughput: +7% QoQ, record high, highest quarterly production since 2022Pueblo Viejo recovery: ~5-6% below earlier-year guidance, now primary focusVeladero: typical winter seasonal decline
——Gold production in line with Q2 (flat)—
Africa & Middle East
Strongest sequential regional growth; Kibali processing grade uplifted ahead of expected strong Q4 delivery.
Kibali: +15% QoQ on higher open-pit volumes and grades, heading into strong Q4North Mara: +3% QoQ (underground and open pit exceeded expectations)Bulyanhulu: flat QoQRegional costs: down across the board
——Gold production +8% QoQ (largest of all regions)Attributable EBITDA +65% QoQ
Copper (Lumwana)
Slight QoQ decline driven by a planned September shutdown; copper business expected to deliver within guidance for the year.
Lumwana: September preventative-maintenance plant shutdownCopper costs: already within guidanceQ4 outlook: production similar to Q2, strong finish expected
——Production slightly down QoQ—

Product announcements

ProductTypeDetails
Fourmile updated Preliminary Economic Assessment (PEA)milestone

Deals & partnerships

Hemlo (buyer not named) divestiture

Non-core asset sale; management expects the sale to conclude before year-end.

Tongon (buyer not named) divestiture

Non-core asset sale expected to conclude before year-end; management said no other disposal processes are currently underway.

Newmont joint venture (existing Nevada Gold Mines JV)

Newmont is Barrick's NGM JV partner; Fourmile will eventually enter the JV, but only after drilling, declines and a feasibility study are complete — terms of that vend to be discussed later. No material JV changes this quarter.

Fluor EPCM contractor engagement (Reko Diq)

Fluor came on board as EPCM contractor mid-year and drove the resequencing of Reko Diq cash flows.

Capital programs

Fourmile gold project (Nevada) underway (exploration/pre-feasibility)
Period spend: Exploration budget increased by a little over $10M for the remainder of 2025
Start: Exploration/drilling ongoing; Bullion Hill decline development to begin end-2026

Benefit:On track to double the existing resource in 2025; updated PEA cites rare grade/scale/exploration upside

16 drill rigs currently, 20 planned for 2026; decline development toward end-2026 to enable a feasibility study; will ultimately enter the Newmont NGM JV after feasibility.

Reko Diq (copper-gold construction, Pakistan) underway
Period spend: Some 2025 cash flow rescheduled into 2026 and 2027 (order-timing driven)
Funding: Project financing with lender group including U.S. Exim (financing signing expected by end-2025)
Start: Under construction; Fluor engaged as EPCM contractor mid-2025

Capex resequenced with no impact on overall project schedule or total capital; financing well advanced with lenders, awaiting U.S. Exim signature once the U.S. government shutdown lifts.

Lumwana copper expansion (Zambia) in execution

Named by management as a current growth project in execution alongside Reko Diq; no specific budget or schedule numbers disclosed this call.

Risks & headwinds

Fatalities and safety culture Immediate / ongoing #1 priority

3 fatalities in the quarter (Goldrush, Bulyanhulu, Kibali); TRIFR declining YoY but fatalities up over last couple of years; 86,000+ CCVs completed YTD

Mitigation:Full investigations; focus on culture, leadership and field supervision; more group-level safety resources; competency-based training; improving quality of critical control verifications on fatal risks

Pueblo Viejo recovery shortfall Near-term

Recovery running ~5-6% below the level guided earlier in the year

Mitigation:Independent Hatch review on site; focus on stockpile handling and float-circuit feed blending; real-time data to operators to reduce intraday recovery swings

Carlin unplanned downtime Q3, addressed

Unplanned Gold Quarry roaster downtime from excessive scaling at end of quarter (unquantified)

Mitigation:Scaling taken care of; operational review rebuilding planned maintenance to prevent recurrence

Copper production disruption (Lumwana) Q3; Q4 recovery expected

Copper production slightly down QoQ due to September preventative-maintenance shutdown

Mitigation:Shutdown was planned; Q4 copper expected similar to Q2 with a strong finish, within guidance

Higher gold prices raising royalty-linked cash costs Ongoing while gold prices elevated

Royalty pressure on cash costs; costs only 'within guidance' after adjusting for higher gold price (unquantified)

Mitigation:Higher volumes and lower unit costs offset; management frames as within guidance on an adjusted basis

Reko Diq financing delay Until shutdown lifts; targeting signing by end-2025

U.S. Exim unable to sign due to U.S. government shutdown (unquantified)

Mitigation:Lender group otherwise well advanced; reengage with U.S. Exim once shutdown lifts

Mali (Loulo-Gounkoto) detentions and suspension Ongoing

4 employees detained ~11 months; operation on care and maintenance

Mitigation:Priority on securing employees' release; site kept on care and maintenance and capable of restart once resolved

NGM workforce turnover / delivery inconsistency Addressed via operational review

Higher turnover at Nevada Gold Mines flagged; unplanned surprises undermining quarterly delivery (unquantified)

Mitigation:Bottom-up operational review focused on planned maintenance, utilization and stabilizing quarter-on-quarter delivery

Q&A highlights

Given the recapitalization already done (new fleet, roasters, autoclaves), what is incremental in the bottom-up NGM review, and was the Carlin scaling issue a maintenance miss?

The review rebuilds plans from the base to stabilize NGM and deliver consistently, focused on mining efficiency, utilization and especially planned maintenance to avoid surprises like Carlin. Henri Gonin confirmed the Gold Quarry roaster scaling built up after the shutdown and was unforeseen but has been addressed.

“That buildup of the scaling happened after the shutdown at Gold Quarry and it was unforeseen, but it's been taken care of now.”

asked by Fahad Tariq · answered by Mark Hill / Henri Gonin

4 min read 7 chapters

Detailed narrative

Interim CEO's operational review and Nevada focus

Interim CEO and Group COO Mark Hill, in the role since September, is running a bottom-up operational review of Barrick's assets, about halfway complete, with detailed conclusions due at the February full-year results. The review rebuilds mine plans from the base, emphasizing planned maintenance and utilization to eliminate unexpected surprises like Carlin's roaster downtime and deliver predictable quarter-on-quarter output.

Management does not expect major changes to next year's budget or medium-term guidance from the review. Hill repeatedly stressed that Nevada is the core of the company — delivering more than half of production from a low-risk jurisdiction — and that a larger share of exploration spend will shift to Nevada and North America.

Record financial quarter and capital allocation

Barrick set company records for operating cash flow, free cash flow, adjusted net earnings and adjusted EPS, with cash flow more than tripling from Q2 and free cash flow up 274% QoQ. Year-to-date 2025 the company generated $5 billion in operating cash flow, reinvested more than $2 billion in the business, paid $596 million in dividends and exhausted its $1 billion repurchase authorization ($598 million repurchased in Q3).

The Board raised the base quarterly dividend 25% to $0.125/share (total quarterly dividend $0.175 including a $0.05 performance dividend) and authorized a further $500 million buyback increase, expanding the program to $1.5 billion. The company ended the quarter in a net cash position.

Regional operating performance

Gold production rose 4% QoQ. North America gold was up 4% on stronger Cortez leach-pad output and higher Turquoise Ridge throughput at the Sage autoclave, with all NGM sites reporting lower unit cost per ounce and regional attributable EBITDA up 19% QoQ; Carlin was held back by unplanned Gold Quarry roaster downtime from excessive scaling.

Latin America & Asia Pacific was flat QoQ as Veladero's seasonal winter decline offset record Pueblo Viejo throughput (+7% QoQ, highest quarterly production since 2022). Africa & Middle East posted the largest QoQ gain, +8%, led by Kibali +15% on higher open-pit volumes and grades, North Mara +3% and Bulyanhulu flat, lifting regional attributable EBITDA 65% QoQ.

Fourmile discovery and PEA

Management characterized Fourmile as arguably this century's most significant gold discovery, citing a rare combination of grade, scale and exploration upside confirmed by an updated PEA in September. Sixteen drill rigs are on site, with the company on track to double the existing resource in 2025 and the exploration budget increased by a little over $10 million for the remainder of the year.

Twenty rigs are planned for 2026, with the Bullion Hill decline development to begin toward the end of 2026 to enable a feasibility study. Fourmile will ultimately enter the Nevada Gold Mines JV with Newmont, but only after drilling, declines and a feasibility study are complete; there were no material JV changes this quarter.

Pueblo Viejo recovery challenge

While PV achieved record throughput, recovery is running roughly 5-6% below the level guided earlier in the year, and improving recovery is now the primary focus. Hatch is on site conducting an independent review. Management pointed to stockpile handling and feed blending into the float circuit as critical, aiming to get real-time data to operators to avoid wild intraday recovery swings.

The plant continues to process a combined feedstock of fresh and stockpiled material.

Safety — three fatalities

Three colleagues died in the quarter — at Goldrush, Bulyanhulu and Kibali (the Kibali fatality resulting from a Q2 incident) — and management made safety the company's explicit #1 priority, launching full investigations. While the total recordable injury frequency rate has fallen year-on-year, fatalities have risen over the last couple of years, which management attributed to over-focus on lagging indicators and gaps in fatal-risk hazard recognition.

Remedies center on culture, leadership and supervision — getting supervisors out of administrative tasks and into the field — plus more group-level safety resources, competency-based training, and improving the quality (not just quantity) of the 86,000+ critical control verifications completed year-to-date.

Portfolio actions and Mali situation

Barrick agreed to sell Hemlo and Tongon, both expected to close before year-end and supporting the expanded buyback. Management said no other asset sale processes are currently underway, with focus on the Americas, NGM, PV, the Lumwana expansion and Reko Diq construction.

The Mali (Loulo-Gounkoto) situation remains paused: management's priority is securing the release of four employees detained roughly 11 months in Bamako, with the site kept on care and maintenance and capable of restart once the situation is resolved.

Summary of the company's earnings call; see how call summaries are prepared. Not investment advice.