Inve India ▾

Konstelec Engineers share price & results

Konstelec Engineers Limited· Construction· Industrials

Results to
Mar 2026
Latest analysed call
Q4 FY26
Ownership as of
Mar 2026

Mumbai-based electrical, instrumentation and automation EPC contractor delivering turnkey engineering-procurement-construction and O&M solutions for industrial and infrastructure clients.

Company research is public. Sign in to keep your own companies, notes and cases.

Reported

The figures, each with its period

Each figure keeps its basis and period; nothing is filled in.

MetricValueChangeBasisPeriodNote
Revenue106 ₹ crore−2.8% YoYQuarterly, as filedQuarter to Mar 2026Revenue from operations as filed.
Operating margin12.0 %+7.3 pts YoYOperating profit / revenueQuarter to Mar 2026For the quarter; a change is in percentage points.
Net profit6.0 ₹ crore+500.0% YoYQuarterly, as filedQuarter to Mar 2026Profit after tax as filed.
Return on equityUnavailable+1.6 ptsFY Mar 2026 vs FY Mar 2025Trailing twelve monthsTTM · period unavailableNot in the analysed materials. No older figure is substituted.
Free cash flow margin-6.53 %+2.6 ptsFY Mar 2026 vs FY Mar 2025Fiscal yearFY ending Mar 2026(Operating cash flow − fixed-asset purchases + disposals) ÷ revenue.
Revenue growth (YoY)Unavailable+18.0 ptsFY Mar 2026 vs FY Mar 2025Trailing twelve monthsTTM · period unavailableNot in the analysed materials. No older figure is substituted.

Source: Inve data from filed results; ratios from the Screener-verified panel · to Mar 2026

Guidance

What management said, and what became of it

0 of 5 judged targets kept · 6 open · verdicts reflect calls analysed to Q4 FY26.

Konstelec Engineers Limited management guidance track record on Inve: 11 targets tracked across analysed earnings calls (0 achieved, 5 missed, 6 open).

TargetOriginal wordingSaidLatest callVerdict
Total Income & PATExceed the performance of last financial year 24
Call transcript, Q3 FY25 · 5 Feb 2025
Q3 FY25Q4 FY26:Promise related to FY25 performance, which was concluded as missed. FY26 data does not alter this verdict.
Call transcript, Q4 FY26 · 27 May 2026
Missed
Bottom Line MarginImprove the bottom line by bidding for larger size projects
Call transcript, Q3 FY25 · 5 Feb 2025
Q3 FY25Q4 FY26:FY26 PAT margin improved to 3.47% from 2.43% in FY25. H2 FY26 PAT margin was 5.45%, indicating progress on improving profitability. Management continues to cite a focus on higher-value projects.
Call transcript, Q4 FY26 · 27 May 2026
On Track

Source: Inve Guidance Tracker for Konstelec Engineers Limited · to Q4 FY26

A verdict describes what became of management’s own words in later analysed calls. “Delayed” is a change of date, “went quiet” a target the calls stopped mentioning. None of it is a judgement on the investment. The methodology sets out how verdicts are recorded.

5 of Konstelec Engineers Limited's 11 targets were missed. See which ones, and which are quietly gone. The 2 above are the free sample; 9 more targets are in the full ledger.

Free account: 5 full ledgers a month and one Inve Case. Pro opens 100 a month, ₹499.
See the full record

Price

₹43.55 −4.81% · −₹2.2

Last close 27 Oct 2026 · NSE · INR · Source: Inve

Performance −35.8% 1Y

₹30.0₹40.0₹50.0₹60.0₹70.0Oct 25Dec 25Jan 26Mar 26Apr 26Jun 26Jul 26Sept 26Oct 26Q4 FY26 — 27 May 2026

1Y: ₹67.85 on 24 Oct 2025 → ₹43.55. High ₹67.85 (24 Oct 2025), low ₹28.65 (30 Mar 2026).

Previous close
₹45.75
Market cap
₹77 Cr
52-week range
₹28.65 – ₹67.85
One year
−33.10%
Price to earnings (FY ending Mar 2026)
11.00×
Return on equity (FY ending Mar 2026)
6.83%

Overview

Symbol
NSE:KONSTELEC
Industry
Industrials
Exchange
NSE
Currency
INR

What Konstelec Engineers Limited does

Based on the company's own presentations, annual report and earnings calls.

Konstelec Engineers Limited executes integrated electrical, instrumentation and automation EPC projects across the full lifecycle - engineering, procurement, construction/commissioning, and operations & maintenance - for industrial and infrastructure clients such as refineries, steel, cement and power plants. Its scope covers HT/LT electrical installations, substations and switchyards up to 220kV, cabling and power distribution systems, industrial electrification, PLC/SCADA and process automation, control panel integration, and O&M services (routine, breakdown and preventive maintenance), which contribute about 10% of revenue. The company is expanding into newer verticals including defence infrastructure, data centres, transmission & distribution, renewable energy and water treatment (STP/WTP), and has a growing overseas presence including a Saudi Arabia JV and operations in Nigeria/Africa.

Segments

  • Electrical EPC Services
  • Instrumentation & Automation
  • Operations & Maintenance
  • Emerging verticals
Order book
₹550+ Cr (as of 22 May 2026)
Projects successfully delivered
200+
Ongoing projects
70+
Manpower / workspace strength
900+
States of presence (India)
15+
Locations/offices
100+
Founded 1995Headquarters Mumbai, Maharashtra, India Company website

How the price took the results

close before → close after

Q4 FY26
+5.0%
27 May

The move from the last close before each results date to the first close after it — the market's first read on the quarter, not the quarter itself.

Your own record

Start an Inve Case for Konstelec Engineers Limited

Free account: one company. Everything above stays public.

Write why you follow Konstelec Engineers Limited and the condition you want checked. Inve compares your numeric conditions with available results and management guidance; your own conditions remain yours to review.

What an account adds