Inve India ▾

Anzen IYEP Trust share price & results

Anzen IYEP Trust· Power· Utilities

Results to
Jun 2026
Latest analysed call
Q4 FY25

InvIT owning power transmission lines across India, with a ROFO pipeline into solar generation assets.

Company research is public. Sign in to keep your own companies, notes and cases.

Reported

The figures, each with its period

Each figure keeps its basis and period; nothing is filled in.

MetricValueChangeBasisPeriodNote
Revenue288 ₹ crore+161.8% YoYQuarterly, as filedQuarter to Jun 2026Revenue from operations as filed.
Operating margin80.0 %−9.0 pts YoYOperating profit / revenueQuarter to Jun 2026For the quarter; a change is in percentage points.
Net profit54.0 ₹ crore+440.0% YoYQuarterly, as filedQuarter to Jun 2026Profit after tax as filed.
Return on equity1.84 %+1.4 ptsFY Mar 2026 vs FY Mar 2025Trailing twelve monthsTTM to Jun 2026Adjusted profit attributable to owners ÷ average owners’ equity.
Free cash flow marginUnavailable—Fiscal yearFY ending Mar 2026Not in the analysed materials. No older figure is substituted.
Revenue growth (YoY)107.03 %+72.1 ptsFY Mar 2026 vs FY Mar 2025Trailing twelve monthsTTM to Jun 2026Revenue change against the same period one year earlier.

Source: Inve data from filed results; ratios from the Screener-verified panel · to Jun 2026

Guidance

What management said, and what became of it

1 target tracked, none judged yet · 1 open · verdicts reflect calls analysed to Q4 FY25.

Anzen IYEP Trust management guidance track record on Inve: 1 target tracked across analysed earnings calls (0 achieved, 0 missed, 1 open).

TargetOriginal wordingSaidLatest callVerdict
Regulatory Filing DeadlineSubmit AGM voting results to stock exchanges within 48 hours of the AGM's conclusion.
Call transcript, Q4 FY25 · 28 Jul 2025
Q4 FY25Q4 FY25:Stated that the scrutinizer's report and voting results will be submitted to stock exchanges within 48 hours of the AGM's conclusion on July 28, 2025.
Call transcript, Q4 FY25 · 28 Jul 2025
New

Source: Inve Guidance Tracker for Anzen IYEP Trust · to Q4 FY25

A verdict describes what became of management’s own words in later analysed calls. “Delayed” is a change of date, “went quiet” a target the calls stopped mentioning. None of it is a judgement on the investment. The methodology sets out how verdicts are recorded.

1 of Anzen IYEP Trust's 1 targets is still open. See which are on track and which have gone quiet.

Free account: 5 full ledgers a month and one Inve Case. Pro opens 100 a month, ₹499.
See the full record

Price

₹124 −2.75% · −₹3.5

Last close 27 Oct 2026 · NSE · INR · Source: Inve

Performance +6.4% 1Y

₹115₹120₹125₹130Oct 25Dec 25Jan 26Mar 26Apr 26Jun 26Aug 26Sept 26

1Y: ₹116.5 on 24 Oct 2025 → ₹124. High ₹132.9 (18 Aug 2026), low ₹114 (24 Nov 2025).

Previous close
₹127.5
Market cap
₹3.3k Cr
52-week range
₹114 – ₹132.9
One year
+2.90%
Price to earnings (TTM to Jun 2026)
98.79×
Return on equity (TTM to Jun 2026)
1.84%

Overview

Symbol
NSE:ANZEN
Sector
Power
Industry
Utilities
Exchange
NSE
Currency
INR

What Anzen IYEP Trust does

Based on the company's own presentations, annual report and earnings calls.

Anzen India Energy Yield Plus Trust is a SEBI-registered Infrastructure Investment Trust that owns and operates power transmission lines in India on a build-own-operate-maintain basis, earning availability-linked transmission charges from state and central utility off-takers under long-term Transmission Service Agreements routed through PGCIL's point-of-connection mechanism. It also holds a Right of First Offer on a portfolio of solar power projects, giving it a pre-agreed pipeline for future acquisitions into solar generation. The Trust is managed by Edelweiss Real Assets Managers Limited as Investment Manager, with Sekura Energy Pvt Ltd acting as Project Manager and Axis Trustee Services as Trustee.

Segments

  • Transmission assets
  • ROFO solar assets (pipeline)
Transmission network length
~855 circuit km (DMTCL ~277 ckm + NRSS XXXIB ~578 ckm)
Operating transmission projects
2 (DMTCL, NRSS XXXIB)
States with transmission/solar presence
7 (Punjab, Haryana, Rajasthan, Uttar Pradesh, Bihar, Telangana, Andhra Pradesh)
ROFO solar pipeline capacity
~813 MWp across 12 solar project companies
Transmission Service Agreement tenor
35 years (residual tenor ~29 years as of FY23)
Operational track record (transmission)
~6 years since commercial operations (DMTCL COD Aug 2017, NRSS XXXIB COD Mar 2017)

Your own record

Start an Inve Case for Anzen IYEP Trust

Free account: one company. Everything above stays public.

Write why you follow Anzen IYEP Trust and the condition you want checked. Inve compares your numeric conditions with available results and management guidance; your own conditions remain yours to review.

What an account adds