Inve India ▾

NTPC share price & results

NTPC Limited· Power· Utilities

Results to
Jun 2026
Latest analysed call
Q1 FY27
Ownership as of
Sept 2026

India's largest integrated power utility, generating from coal, gas, hydro, solar and wind

Company research is public. Sign in to keep your own companies, notes and cases.

Reported

The figures, each with its period

Each figure keeps its basis and period; nothing is filled in.

MetricValueChangeBasisPeriodNote
Revenue50,741 ₹ crore+7.8% YoYQuarterly, as filedQuarter to Jun 2026Revenue from operations as filed.
Operating margin32.0 %+5.0 pts YoYOperating profit / revenueQuarter to Jun 2026For the quarter; a change is in percentage points.
Net profit6,896 ₹ crore+12.9% YoYQuarterly, as filedQuarter to Jun 2026Profit after tax as filed.
Return on equity14.34 %+1.4 ptsFY Mar 2026 vs FY Mar 2025Trailing twelve monthsTTM to Jun 2026Adjusted profit attributable to owners ÷ average owners’ equity.
Free cash flow margin3.68 %−1.3 ptsFY Mar 2026 vs FY Mar 2025Fiscal yearFY ending Mar 2026(Operating cash flow − fixed-asset purchases + disposals) ÷ revenue.
Revenue growth (YoY)2.35 %−5.8 ptsFY Mar 2026 vs FY Mar 2025Trailing twelve monthsTTM to Jun 2026Revenue change against the same period one year earlier.

Source: Inve data from filed results; ratios from the Screener-verified panel · to Jun 2026

Guidance

What management said, and what became of it

1 of 10 judged targets kept · 14 open · verdicts reflect calls analysed to Q1 FY27.

NTPC Limited management guidance track record on Inve: 24 targets tracked across analysed earnings calls (1 achieved, 9 missed, 14 open).

TargetOriginal wordingSaidLatest callVerdict
New Thermal Awarding FY274 GW (Lara-2, Jhabua, BRBCL, Bhilai)
Call transcript, Q3 FY26 · 30 Jan 2026
Q3 FY26Q1 FY27:The specific 4 GW thermal awarding target for FY27 was not mentioned in the Q1 FY27 call. Management focused on broader, long-term capacity plans.
Call transcript, Q1 FY27 · 27 Jul 2026
Ghosted
Group COD FY279,557 MW (1,070 MW thermal, 250 MW hydro, 8,237 MW RE)
Call transcript, Q4 FY26 · 27 May 2026
Q4 FY26Q1 FY27:The renewable component of the FY27 target was revised down from 8,237 MW to a range of 7-8 GW. However, 1.9 GW of capacity has already been added in FY27 YTD, showing some progress.
Call transcript, Q1 FY27 · 27 Jul 2026
Revised Down
NGEL CAPEX FY26₹30,000 crore
Call transcript, Q2 FY26 · 30 Oct 2025
Q2 FY26Q4 FY26:Final capex for NGEL in FY26 was ₹35,800 crore, exceeding the original guidance of ₹30,000 crore.
Call transcript, Q4 FY26 · 27 May 2026
Achieved

Source: Inve Guidance Tracker for NTPC Limited · to Q1 FY27

A verdict describes what became of management’s own words in later analysed calls. “Delayed” is a change of date, “went quiet” a target the calls stopped mentioning. None of it is a judgement on the investment. The methodology sets out how verdicts are recorded.

9 of NTPC Limited's 24 targets were missed. See which ones, and which are quietly gone. The 3 above are the free sample; 21 more targets are in the full ledger.

Free account: 5 full ledgers a month and one Inve Case. Pro opens 100 a month, ₹499.
See the full record

Price

₹300 +0.67% · +₹2

Last close 26 Oct 2026 · NSE · INR · Source: Inve

Performance −11.7% 1Y

₹300₹350₹400Oct 25Dec 25Jan 26Mar 26Apr 26Jun 26Jul 26Sept 26Oct 26Q2 FY26 — 30 Oct 2025Q3 FY26 — 30 Jan 2026Q4 FY26 — 27 May 2026Q1 FY27 — 27 Jul 2026

1Y: ₹339.6 on 24 Oct 2025 → ₹300. High ₹410.2 (27 Apr 2026), low ₹298 (23 Oct 2026).

Previous close
₹298
Market cap
₹2.9L Cr
52-week range
₹298 – ₹410.2
One year
−12.22%
Price to earnings (TTM to Jun 2026)
10.58×
Return on equity (TTM to Jun 2026)
14.34%

Overview

Symbol
NSE:NTPC
Sector
Power
Industry
Utilities
Exchange
NSE
Currency
INR

What NTPC Limited does

Based on the company's own presentations, annual report and earnings calls.

NTPC Limited is India's largest integrated power utility, generating electricity from coal, gas, hydro, solar and wind and selling it largely to state distribution companies under regulated tariffs. It operates through standalone stations plus numerous subsidiaries and joint ventures (NTPC Green Energy, THDC India, NEEPCO, NTPC Mining, NTPC Vidyut Vyapar Nigam). It is also the third-largest coal mining company in India through its captive mines, and is expanding into nuclear (a JV with NPCIL), pumped storage, battery storage and green hydrogen.

Segments

  • Thermal generation
  • Renewable energy
  • Hydro & pumped storage
  • Coal mining
  • Power trading
Market position
India's largest integrated power utility
Group installed capacity (FY26)
89,108 MW
Standalone installed capacity (FY26)
60,796 MW
Capacity under construction
34,188 MW (16,520 MW coal, 2,631 MW hydro/PSP, 15,037 MW renewables)
Coal mining position
Third-largest coal mining company in India
Top-ranked stations
5 stations (Korba, Lara, Darlipali, Rihand, Sipat) ranked among India's top 25
Founded 1975Headquarters New Delhi, India Company website

How the price took the results

close before → close after

Q1 FY27
+1.0%
27 Jul
Q4 FY26
+2.2%
27 May
Q3 FY26
−0.6%
30 Jan
Q2 FY26
−0.7%
30 Oct

The move from the last close before each results date to the first close after it — the market's first read on the quarter, not the quarter itself.

Your own record

Start an Inve Case for NTPC Limited

Free account: one company. Everything above stays public.

Write why you follow NTPC Limited and the condition you want checked. Inve compares your numeric conditions with available results and management guidance; your own conditions remain yours to review.

What an account adds